With the spring of 2023 now well underway and summer arriving faster than most usually give it credit for, construction and ground crews have been seen kicking their combined efforts as witnessed by the Winchendon Courier into overdrive at the Winchendon Amphitheater project on Thursday, April 27, as several crew members finally left the grounds at 6:30 pm staying late as Toy Town has park performance dates not long off.
The main parking lot closest to the Amphitheater at this time, offers 45 regular parking spaces, and an additional 4 handicapped parking spaces. The vast majority of street lighting is in place, with final wiring either nearly, or completed at this time, with all high efficiency state of the art luminescence in place roughly the entire length of the drive from its Maple Street park entrance to the main parking lot. Along the main access road, a newer soft sandy base coating has been recently added and graded, including in the "Roundabout" which was retained from the previous grounds site for both aesthetic and traffic ease of grounds flow purposes.
Along the site of the Amphitheater seating section itself, the upper balcony / patio which will be handicap friendly via a level access walkway from the parking lot and adjacent sidewalk entrances, has recently since the last Courier update, realized a full pouring of concrete its entire width of the Amphitheaters uppermost and widest section. This section again, to those entering the theater for the first time in the future, will be on the right side of the top of the theater if needed, and not the left, as to be closest to the parking facilities.
Additionally since the last update, the main side concrete stairway which if facing the stage is on the left side of the Amphitheater, now has a nearly fully installed railing on both sides of its steps. The railing has appropriate spacing left in between sections, for accessing the various levels and rows where event spectators will seat themselves appropriately.
Along the grounds at this time, crews while filling the previous large hole or gap between the performance stage and the first row of seating, have brought in fill creating a gentle taper from the stage surface to the first stone wall row. Also near by, grounds workers have been busy attempting to also place the last rows of pre-grown grass sod, in front of the stadium seating, and to the side of the staging area. Additionally, adding to the color combination, a significant amount of "wood chips" has now been added to a large wooded area to the right of the Amphitheater seating area, between both that and the access road which tastefully circles behind it such as to allow performers of all artistic performances to bring their gear and tools of their crafts to the performance stage.
Other updates are still in progress, such as multiple grounds improvements, a large collection of new portable bathrooms, and more. The large barn on site which once had many broken windows at this time has the former windows being boarded up and color matched to the building, picnic tables are still behind the roundabout for those who want to take a rest or other, and during construction process access has still been granted to the facility and grounds trails.
While the site is clearly not finished, it is a fact that in just the last several weeks significant progress of both the physical grounds and structures a like has come to fruition. With crews working late as required, it is clear the OPM "Owner's Project Manager", site Foreman, and others are on the same page. The clock is ticking, there is more daylight available to finish the job on time, performances either have been or are being booked, and tickets sold.
If diversity joined by growth can be a measurement of positive community success, seeing and Amphitheater in its final phases of construction surrounded by parents bringing their children fishing along the waters of the north branch of the Millers River joined by others of all ages simply taking nature walks, then it could be fair to say the joint vision of many Toy Town residents and the Robinson Broadhurst Foundation is about to start turning some heads.


In this comparison of opposing views, the highest and uppermost balcony section of the upcoming Amphitheater can be observed. First we see the entrance where a full width Handicapped Accessible walkway entrance is shown, and in the second photo, its full width span from the opposite side bordering the stairway and railings which lead to the lower levels of the theater seating rows.


While the concrete stair case has been fully wired and lighted for some time, as the project nears completion of its final phases, these side by side photos show the safety railings have now been installed, with the railings on the "Seating Side" allowing appropriate spaces for attendees to both enter and exit the rows as necessary.

Covering raw earth- As Grounds keeps work against time trying to accomplish many finishing touches, both living and previously living materials alike are being placed accordingly. As there is not enough time to grow the grass naturally, additional pre-grown sod is still being applied as needed between the theater's front row, and stage performance area. Photo by Keith Kent

Separating the seating area from the performance stage access road, this section of trees was left by design to provide tasteful cover to the stage access road which circles behind it. The road just like the main park entrance road, has its own street lighting to allow safe travel under the cover of darkness as necessary. Photo by Keith Kent