Ground preparation savings
$500,000Ken Wante will hold a further meeting with the Department of Public Works regarding ground preparation, where DPW estimated best-case savings of about $500,000. — Ken Wante
What every board is dealing with, followed from meeting to meeting — open until it is decided.
Ken Wante will hold a further meeting with the Department of Public Works regarding ground preparation, where DPW estimated best-case savings of about $500,000. — Ken Wante
Chief Smith was assigned to contact the original architect to identify further cost items and clarify the need for a third paid pre-design or RFQ expense. — Chief Smith
Lauren Raps will speak with state representatives to determine if any external funding is available for the new station. — Lauren Raps
The storyFire Chief Tom Smith presented a summary of physical needs including bunk rooms and garages, with a prioritized list due at the next meeting. — Tom Smith
The storyKen Wante presented plans and estimated costs for a Triumph Modular building, with a follow-up planned to break down costs between living quarters and garages. — Ken Wante
Chief Smith will provide a prioritized list of needs at the next session. — Tom Smith
Chief Smith identified the need for space to house all apparatus inside the building. — Tom Smith
The committee reviewed a plan for six bunk rooms with three shower/bathrooms and a dedicated decontamination space. — Tom Smith
Kevin Sutton reported that he contacted Titan Steel for a bid on a metal building and is currently waiting for their response. — Kevin Sutton